View Single Post
Re: Work In progress (WIP) #8.5
Old
  (#12)
Gismo
Member
 
Gismo's Avatar
 
Status: Offline
Posts: 45
Join Date: Jan 2004
Location: Bonnie Scotland
Default Re: Work In progress (WIP) #8.5 - 16-02-2004

For the moment, I have replaced the #8.5 with the #8MM. I have deleted all RBN RBX files and started again from scratch. So far, the HLDS has been running for 19 hours or so. The reason for the switch backwards was that the HLDS was closing every 8 hours or so. I have re-enabled error reporting to see if that can tell me where the fault lies but as the only thing that was changed was the RB MM. The control group I set up has performed well (killed a lot of the clients lol) even down to learning the matrix mod which had the bots really confused before! The only problem I have now is that the old WIP gives me that SZ_Getspace error which I had attributed to Statsme (2.7.1) but after shutting down statsme for 4 hours it was still there.

Can't wait for the next release as RB just gets better and better.

Keep up the great work Stefan!
  
Reply With Quote